CSI MasterFormat for Estimating and Bills of Quantities

See how estimators use CSI MasterFormat to organize a detailed estimate or bill of quantities, then verify work-result references in CSI Dynamic Standards.

Quick answer

Use CSI MasterFormat numbers and titles to group a detailed construction estimate or bill of quantities (BOQ) by work result. Keep the description, measured quantity, unit, and pricing on each estimate line. The bid documents and applicable measurement rules determine what the line includes and how it is measured.

CSI Dynamic Standards search workspace with MasterFormat 2026 Edition and 26.1 OIR selected
Search by number, title, or keyword in CDS. This example shows MasterFormat 2026 and OIR 26.1 selected.

Organize a detailed estimate using the project manual

Use the edition named in the bid documents. Start from the project manual’s table of contents and match the takeoff item to the section that describes the work. Confirm that the section covers what you’re pricing, including furnishing, installation, and any exclusions that affect the bid. Where the manual assigns part of the scope to an adjacent section, keep that reference with the relevant estimate line.

Use [CSI Dynamic Standards](https://standards.theconstructionstandard.com/web/search) to verify the number and title for the edition. A number can be valid in MasterFormat and still be the wrong reference for the scope in a specific project manual. If the project uses a different number or a custom title, keep the project reference and document the discrepancy before changing the estimate.

Example: pricing ductwork and related services

A mechanical estimator pricing a duct system can start with Division 23. The project might call for separate pricing for ductwork, insulation, and testing. Each item needs a description that identifies the scope being priced and any interfaces with the other items.

The takeoff for ductwork might include dimensions or surface area, while testing could be priced as a lump sum if that is how the bid form requests it. The measurement basis and quantity belong to the estimate. The section reference makes it possible for someone reviewing the estimate to find the associated requirements in the project manual. When a bid addendum changes the insulation requirements, that reference helps the team find the affected lines and document what changed.

What to keep with a BOQ or estimate line

  • Scope description and location. Record what is included and where it applies. Retain a drawing or takeoff reference when available.
  • Quantity and measurement basis. Keep the measured quantity, unit, and any assumptions about allowances, waste, or work included in another line.
  • Project specification reference. Keep the section number and title from the project manual and record the edition used to check it.
  • Pricing and bid instructions. Follow the owner’s requested bid breakdown and preserve the estimate’s rate and quantity assumptions.
  • Internal cost code where needed. Store it separately so accounting can retain its own reporting structure. See CSI cost codes and job-cost mapping.

When to use UniFormat

A concept estimate may be easier to review by building element because the design team has defined the system but has yet to select all the materials or methods. Use UniFormat for that elemental view and MasterFormat for the detailed work-result view when enough scope is known. An element such as an exterior enclosure can involve several separately priced work results. Keep the basis of the rollup visible when you carry early costs into a detailed estimate. See UniFormat vs MasterFormat.

Before issuing the estimate, spot-check the project sections with the largest allowances or most scope interfaces. Use [MasterFormat in CDS](https://standards.theconstructionstandard.com/web/search) to verify those references, then reconcile any discrepancies with the latest project documents and bid instructions.

Access Current CSI Standards

CSI Dynamic Standards provides authorized access to MasterFormat, UniFormat, and OmniClass through a connected, edition-aware platform. Create an account to view access options, or review pricing for organization-wide standards use.

Sources and review scope

Reviewed against CSI’s public standards information for scope, terminology, and licensing context. This public guide provides orientation and does not reproduce or replace the licensed standard. Content review date: November 10, 2026.

COMMON QUESTIONS
MasterFormat can organize BOQ lines by work result. Follow the project’s bid instructions and applicable measurement rules for quantities, units, and pricing.
Use the edition referenced by the project documents. Check the section number and title in that edition and keep a record of the source.