MasterFormat Division 25 – Integrated Automation in the Design Development Phase
How MasterFormat Division 25 – Integrated Automation is used during the design development phase. Activities, deliverables, and CSI Dynamic Standards.
Quick answer
MasterFormat Division 25 – Integrated Automation is actively referenced during the design development phase of construction projects. Division 25 covers integrated building automation—systems that coordinate HVAC, lighting, security, fire protection, and other building systems through centralized control and monitoring. Understanding how Division 25 sections are used during design development helps project teams produce accurate deliverables and avoid classification errors that cascade into later phases.
Start with [CSI MasterFormat Division 25: Integrated Automation](/MasterFormat-division-25-integrated-automation) for the broad scope and coordination boundaries. This page addresses the narrower design development phase intent.
Division 25 Activities During Design Development
Design development refines schematic decisions into specific systems, materials, and assemblies. This is where UniFormat elemental scope transitions to MasterFormat specification sections—a critical handoff that determines whether design intent survives into construction documents. CSI Dynamic Standards governs these crosswalks so the transition is traceable and consistent. For Division 25 specifically, the design development phase involves focused work on integrated automation scope, products, and execution requirements. Insert authorized MasterFormat numbers and titles as discipline sections are developed. Keep reference standards coherent across sections with edition awareness.
Key activities for Division 25 during design development include:
- Map UniFormat elements to specific MasterFormat specification sections — as it relates to integrated automation sections and the products, methods, and quality standards they define
- Insert authorized MasterFormat numbers/titles for discipline sections — as it relates to integrated automation sections and the products, methods, and quality standards they define
- Update cost models to bridge UniFormat elemental and MasterFormat section formats — as it relates to integrated automation sections and the products, methods, and quality standards they define
Each of these activities requires current, accurate Division 25 section numbers. When teams reference outdated or incorrect section numbers during design development, the errors propagate into every subsequent phase.
Division 25 Sections Referenced in Design Development
The following Division 25 sections are commonly referenced during design development work:
- 25 05 00 – Common Work Results for Integrated Automation
- 25 10 00 – Integrated Automation Network Equipment
- 25 30 00 – Integrated Automation Instrumentation and Terminal Devices
- 25 50 00 – Integrated Automation Facility Controls
These sections define the scope boundaries, product requirements, and execution standards for integrated automation work. During design development, these section references appear in drafted specification sections with authorized numbering and must be consistent with the project manual.
Design Development Deliverables That Reference Division 25
Project teams produce or consume these deliverables during the design development phase, many of which directly reference Division 25 sections:
- Drafted specification sections with authorized numbering
Every deliverable that references Division 25 must use current section numbers and titles. A single incorrect section reference in a design development deliverable can trigger RFIs, scope disputes, or change orders during construction.
Common Issues with Division 25 During Design Development
- Design intent lost in the UniFormat-to-MasterFormat transition — When this occurs with Division 25 references during design development, the result is rework, coordination failures, or documentation that contradicts the project manual.
- Specification sections drafted with outdated section numbers — When this occurs with Division 25 references during design development, the result is rework, coordination failures, or documentation that contradicts the project manual.
- BIM elements not classified for lifecycle use — When this occurs with Division 25 references during design development, the result is rework, coordination failures, or documentation that contradicts the project manual.
These issues are compounded when Division 25 sections must coordinate with other divisions. This division includes integrated automation network equipment, integrated automation facility controls, and integrated automation instrumentation and terminal devices. The more trades and disciplines that touch Division 25 scope during design development, the higher the cost of classification errors.
Cross-Standard Connections for Division 25 in Design Development
UniFormat: Division 25 spans multiple UniFormat D (Services) elements—integrating controls for HVAC, lighting, fire protection, and security into a unified system.
OmniClass: OmniClass Table 23 (Products) classifies control devices, sensors, and network equipment; Table 14 (Phases) covers commissioning of integrated systems.
During the design development phase, these cross-references ensure that Division 25 specifications align with element-level classifications and lifecycle tags. Teams who rely on controls engineers designing building automation systems and bms integrators and programmers to maintain these connections manually risk inconsistencies that surface as coordination issues downstream.
How CSI Dynamic Standards Helps with Division 25 in Design Development
CSI Dynamic Standards includes Division 25 as part of a connected, edition-aware classification system—licensed through The Construction Standard. Built for real project work from concept to closeout and beyond, it provides always-current Division 25 section numbers and titles, governed cross-references to UniFormat and OmniClass, and edition tracking that prevents design development deliverables from referencing obsolete classification data. For teams working through the design development phase, this means Division 25 references in every deliverable stay accurate and consistent with the rest of the project manual.
Access Current CSI Standards
CSI Dynamic Standards provides authorized access to MasterFormat, UniFormat, and OmniClass through a connected, edition-aware platform. Create an account to view access options, or review pricing for organization-wide standards use.
Sources and review scope
Reviewed against CSI’s public standards information for scope, terminology, and licensing context. This public guide provides orientation and does not reproduce or replace the licensed standard. Content review date: July 31, 2026.
People also search for
Explore closely related CSI divisions, standards, and construction classification topics.
Ready to Get Started?
CSI Dynamic Standards includes MasterFormat, UniFormat, and OmniClass as a connected, edition-aware system. The Construction Standard provides licensed access—built for the speed of your work.