BIM Handover Information: Asset Data and Closeout

See what BIM handover information to deliver at closeout, how to verify an installed asset record, and where COBie and CSI classifications fit.

Quick answer

BIM handover information is the set of verified model, asset, and document records an owner receives to operate and maintain a facility. Agree with the facilities team which assets, fields, documents, and delivery formats it needs. Review a sample early enough to correct gaps before the final delivery.

What belongs in a BIM handover

The project requirements determine the deliverables. Typical records can include the following:

  • Asset and location identifiers. Capture the installed asset tag and where the receiving team can find it. Use the agreed naming and identification rules.
  • Installed equipment information. Record the verified manufacturer, model, and serial number where required. Link the approved submittal, warranty, and operation and maintenance instructions.
  • System relationships and commissioning. Identify the system the asset serves. Keep the relevant commissioning and test records where the owner can retrieve them.
  • Model and document references. Identify the model revision, applicable specification or approved scope, and links to supporting documents.
  • Classification and edition. Record the standard and edition used for each classification. Keep the asset tag as a separate field so multiple assets of the same type can still be identified.

Decide who supplies and reviews each field

Confirm who provides each field, when it becomes available, and who checks it. Design information may identify the intended system and its location. Installation records can supply the final model, serial number, and approved documentation. The receiving team should define which fields it expects to import and test that the linked files and records remain accessible.

If the project requires COBie, confirm the applicable version, selected tables and fields, delivery milestones, and acceptance criteria with the owner. COBie structures the exchange of asset information. CSI standards can provide classifications for that information where required. Check the delivered file and its import in the receiving system.

Example: verify a pump record at closeout

Pick an installed pump and trace it from the model to the approved equipment submittal and commissioning record. Compare the installed tag and location against the records being handed over. Check the manufacturer and model against the installed equipment. If several pumps share a classification and model, keep their individual tags and test records distinct.

Use OmniClass where the project calls for a product or other lifecycle classification. Keep the MasterFormat specification reference and any UniFormat system reference as separate fields when the owner needs them. Verify available numbers, titles, and relationships in CSI Dynamic Standards. The project team still determines whether each reference fits the actual installed asset.

Test a sample with facilities

Before the final submission, ask facilities staff to locate the sample asset, identify its system, and open the documents they need for maintenance. Have them test the agreed import or intake process. Log missing fields, broken links, and inconsistent identifiers against the source record and assign each correction to its responsible team. Repeat the test when the delivery format or owner requirements change.

See how to carry scope from design through operations and how to classify BIM information with OmniClass. Use [CSI Dynamic Standards search](https://standards.theconstructionstandard.com/web/search) to verify the classification references for the editions your project specifies.

Access Current CSI Standards

CSI Dynamic Standards provides authorized access to MasterFormat, UniFormat, and OmniClass through a connected, edition-aware platform. Create an account to view access options, or review pricing for organization-wide standards use.

Sources and review scope

Reviewed against CSI’s public standards information for scope, terminology, and licensing context. This public guide provides orientation and does not reproduce or replace the licensed standard. Content review date: November 11, 2026.

COMMON QUESTIONS

Common Questions About BIM Handover Information: Asset Data and Closeout

Use the owner’s requirements to determine which model, asset, and document records to deliver. Typical records include asset tags, locations, installed equipment details, maintenance documents, commissioning records, and any required classifications.
COBie defines how asset information is exchanged. OmniClass can supply classification references in that exchange when the owner requires them. Confirm the format and field rules with the receiving facilities team.
CSI Dynamic Standards℠

Access MasterFormat®, UniFormat®,
and OmniClass®

Learn more